• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

intracom-telecom-sdn / nstat
60%

Build:
DEFAULT BRANCH: master
Repo Added 01 Oct 2015 08:06AM UTC
Files 20
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH master
branch: master
CHANGE BRANCH
x
Reset
  • master
  • develop_Dockerfile_review
  • develop_controller_refactor
  • develop_provision
  • develop_release_1.1

pending completion
344

push

travis-ci

web-flow
Merge pull request #14 from intracom-telecom-sdn/develop_flow_latency_measurement

Added flow rquest latency measurement on topology switches

678 of 1139 relevant lines covered (59.53%)

0.6 hits per line

Relevant lines Covered
Build:
Build:
1139 RELEVANT LINES 678 COVERED LINES
0.6 HITS PER LINE
Source Files on master
Detailed source file information is not available for this build.

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
344 master Merge pull request #14 from intracom-telecom-sdn/develop_flow_latency_measurement Added flow rquest latency measurement on topology switches push 02 Aug 2016 01:37PM UTC web-flow travis-ci pending completion  
342 master Merge pull request #15 from intracom-telecom-sdn/develop_virtualenv_review Added final version of NSTAT requirements.txt for pip3 installation push 02 Aug 2016 01:34PM UTC web-flow travis-ci pending completion  
341 master Dockerfile ready for review Pull #17 02 Aug 2016 09:17AM UTC web-flow travis-ci pending completion  
339 master Added final version of NSTAT requirements.txt for pip3 installation Pull #15 02 Aug 2016 09:13AM UTC web-flow travis-ci pending completion  
338 master Added flow rquest latency measurement on topology switches Added as logging message (grep over the log file is required to collect the results) Pull #14 02 Aug 2016 09:12AM UTC web-flow travis-ci pending completion  
331 master fixies in travis, enable coveralls push 15 Jul 2016 12:43PM UTC panageo travis-ci pending completion  
309 master Corrections on docker_create.sh push 27 Jun 2016 01:49PM UTC konstantinos-papadopoulos travis-ci pending completion  
306 master Removed ./ from bulid/stop...hanlders push 24 Jun 2016 09:02AM UTC konstantinos-papadopoulos travis-ci pending completion  
305 master Removed ./ from build etc handlers push 23 Jun 2016 01:10PM UTC konstantinos-papadopoulos travis-ci pending completion  
304 master Corrected results store directory push 23 Jun 2016 12:54PM UTC Konstantinos Papadopoulos travis-ci pending completion  
See All Builds (119)
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc