• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

exa-team / tomaco
100%
master: 100%

Build:
Build:
LAST BUILD BRANCH: integration-tests-layer
DEFAULT BRANCH: master
Repo Added 12 Jul 2019 10:55AM UTC
Files 15
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH integration-tests-layer
branch: integration-tests-layer
CHANGE BRANCH
x
Reset
  • integration-tests-layer
  • add-database-table
  • better-frontend-organization
  • bug-email-auth
  • bug/cleancss
  • change_icon
  • chore/migration
  • chore/pick-a-database
  • chore/user-table
  • dependabot/npm_and_yarn/eslint-utils-1.4.2
  • docker_with_postgres
  • feature/dockerize_tomaco
  • fix-modile
  • fix/coverage
  • integration-tests
  • master
  • pwa-manifest
  • refactoring/auth-app
  • save-user-progress
  • save-user-progress-frontend

pending completion
130

Pull #81

travis-ci

web-flow
test: Poc of the Integration Tests

This PR proofs the concept of adding an additional layer to our pyramid test, which is responsible
for ensuring the connection between Tomaco and other services (like an Auth server or Postgres).

connects to #74
Pull Request #81: test: Poc of the Integration Tests

2 of 2 new or added lines in 1 file covered. (100.0%)

180 of 180 relevant lines covered (100.0%)

1.0 hits per line

Relevant lines Covered
Build:
Build:
180 RELEVANT LINES 180 COVERED LINES
1.0 HITS PER LINE
Source Files on integration-tests-layer
  • Tree
  • List 0
  • Changed 1
  • Source Changed 1
  • Coverage Changed 1
Coverage ∆ File Lines Relevant Covered Missed Hits/Line

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
130 integration-tests-layer test: Poc of the Integration Tests This PR proofs the concept of adding an additional layer to our pyramid test, which is responsible for ensuring the connection between Tomaco and other services (like an Auth server or Postgres). connects to #74 Pull #81 02 Oct 2019 07:35PM UTC web-flow travis-ci pending completion  
129 integration-tests-layer test: Poc of the Integration Tests This PR proofs the concept of adding an additional layer to our pyramid test, which is responsible for ensuring the connection between Tomaco and other services (like an Auth server or Postgres). connects to #74 push 02 Oct 2019 07:33PM UTC kplaube travis-ci pending completion  
125 integration-tests-layer test: Poc of the Integration Tests This PR proofs the concept of adding an additional layer to our pyramid test, which is responsible for ensuring the connection between Tomaco and other services (like an Auth server or Postgres). connects to #74 Pull #81 26 Sep 2019 02:30PM UTC web-flow travis-ci pending completion  
124 integration-tests-layer test: Poc of the Integration Tests This PR proofs the concept of adding an additional layer to our pyramid test, which is responsible for ensuring the connection between Tomaco and other services (like an Auth server or Postgres). connects to #74 push 26 Sep 2019 02:28PM UTC kplaube travis-ci pending completion  
See All Builds (93)
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc