• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

R-unic / loom
93%
master: 92%

Build:
Build:
LAST BUILD BRANCH: style/code-quality
DEFAULT BRANCH: master
Repo Added 29 May 2026 10:11AM UTC
Token pRzz00fen3keyN3RqHsXwMpOR4OrMAm17 regen
Build 244 Last
Files 271
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH test/coverage-critical-paths
branch: test/coverage-critical-paths
CHANGE BRANCH
x
Reset
Sync Branches
  • test/coverage-critical-paths
  • docs/agent-guides
  • feat/array-stdlib-macros
  • feat/centralize-debug-diagnostics
  • feat/event-attributes
  • fix/25-invocation-macro-arguments
  • fix/code-review-findings
  • fix/event-connection-cross-scope-disconnect
  • fix/infer-instantiated-function-types
  • fix/interface-member-event-codegen
  • master
  • parser-error-recovery
  • pattern-matching
  • perf/descendants-and-luau-keywords
  • perf/luau-render-allocations
  • perf/resolver-symbol-lookup
  • perf/token-textspan
  • perf/typegenerator-hotpaths
  • perf/types-property-caching
  • pr-48
  • readme-update
  • refactor/luau-generator-event-disconnect
  • refactor/type-narrowing-dedup
  • refactor/typechecker-split
  • style/code-quality
  • test/more-generation

24 Jul 2026 11:24AM UTC coverage: 92.533% (+0.7%) from 91.846%
30089433039

Pull #62

github

web-flow
Merge 97e4dfc5a into 351d78d81
Pull Request #62: test: fill critical coverage gaps in type checking, config, and diagnostics

3853 of 4388 branches covered (87.81%)

Branch coverage included in aggregate %.

6519 of 6821 relevant lines covered (95.57%)

71251.9 hits per line

Relevant lines Covered
Build:
Build:
6821 RELEVANT LINES 6519 COVERED LINES
71251.9 HITS PER LINE
Source Files on test/coverage-critical-paths
  • Tree
  • List 253
  • Changed 12
  • Source Changed 0
  • Coverage Changed 12
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
30089433039 test/coverage-critical-paths Merge 97e4dfc5a into 351d78d81 Pull #62 24 Jul 2026 11:24AM UTC web-flow github
92.53
See All Builds (244)
  • Settings
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE TRIAL · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc