• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

CKI-project / skt
68%
master: 78%

Build:
Build:
LAST BUILD BRANCH: dont-log-sys-exit-traceback
DEFAULT BRANCH: master
Repo Added 06 Nov 2018 07:37PM UTC
Files 4
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH staging
branch: staging
CHANGE BRANCH
x
Reset
  • staging
  • avoid-none-cross-compiler
  • circleci-fedora29
  • dont-cancel-jobs-on-timeout
  • fix-multipipe-environment
  • generic-make-config
  • log-retcode
  • log-return-code
  • make-opts-as-string
  • master
  • production
  • read-buildlog-directly
  • remove-junit
  • rpm-support
  • show_waived_tests_in_reports
  • simplify-logging
  • store-beaker-results-xml
  • switch_to_cki_waived
  • use-args-for-build
  • use-args-for-merge

pending completion
1515

push

travis-ci

spbnick
Merge commit 'd3eb372' into staging

291 of 485 branches covered (60.0%)

Branch coverage included in aggregate %.

1011 of 1421 relevant lines covered (71.15%)

0.71 hits per line

Relevant lines Covered
Build:
Build:
1421 RELEVANT LINES 1011 COVERED LINES
0.71 HITS PER LINE
Source Files on staging
Detailed source file information is not available for this build.

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
1515 staging Merge commit 'd3eb372' into staging push 11 Dec 2018 11:19AM UTC spbnick travis-ci pending completion  
1468 staging Merge remote-tracking branch 'origin/master' into staging push 27 Nov 2018 12:12PM UTC spbnick travis-ci pending completion  
1465 staging Merge remote-tracking branch 'origin/master' into staging push 26 Nov 2018 05:23PM UTC spbnick travis-ci pending completion  
1463 staging Log config building in buildlog We started running into build failures where the configuration itself fails to build. Since these failures are not logged, the recipients have hard time figuring them out. More importantly, broken build will try t... push 21 Nov 2018 05:35PM UTC spbnick travis-ci pending completion  
1449 staging Don't report aborted tasks The task should abort if there's and infrastructure failure or a kernel panic happened before and the task didn't run. Since the result of this task is not relevant to the developers, it shouldn't be included in the rep... push 16 Nov 2018 02:43PM UTC spbnick travis-ci pending completion  
1438 staging Fix test result reporting in the summary Previously, only test results for failed tests were retrieved. However, this was changed in 3870ef32 and subsequent commits and not reflected in the template, resulting in reporting passed testing as faile... push 13 Nov 2018 12:03PM UTC spbnick travis-ci pending completion  
1434 staging reporter: Use empty list as CC and BCC defaults Use empty lists for CC and BCC address lists when they're unspecified, instead of throwing an exception like this one: Traceback (most recent call last): File "./bin/skt", line 11, in <module> ... push 08 Nov 2018 09:57AM UTC spbnick travis-ci pending completion  
1428 staging Display Beaker URL for failed jobs Beaker logs are helpful, but a link to the Beaker job itself provides a lot more information for kernel developers. The links will only be provided with the 'full' template. Signed-off-by: Major Hayden <major@r... push 07 Nov 2018 10:29AM UTC spbnick travis-ci pending completion  
See All Builds (458)
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc