• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

Alignak-monitoring-contrib / alignak-backend
90%
develop: 90%

Build:
Build:
LAST BUILD BRANCH: packaging
DEFAULT BRANCH: develop
Repo Added 05 Nov 2016 10:32AM UTC
Files 42
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH closes-#421
branch: closes-#421
CHANGE BRANCH
x
Reset
  • closes-#421
  • 1.3.0
  • 1.4.0
  • 1.4.1
  • 1.4.10
  • 1.4.2
  • 1.4.4
  • 1.4.5
  • 1.4.8
  • 1.4.9
  • alignak-notification
  • clean-requirements
  • closes-#328
  • closes-#451
  • closes-#491
  • closes-#507
  • confirm-#503
  • db-indexes
  • default-pagination
  • develop
  • develop+build
  • develop+logger
  • eve-upgrade
  • fix-#511
  • fix-#518
  • grafana-datasource
  • master
  • metric-overall_state
  • notify-host-delete
  • overall_state
  • packaging
  • pycodestyle
  • update-requirements

pending completion
2236

push

travis-ci

mohierf
Closes #421: backend is very long to stop because of the timeseries retention flush
Add a logger configuration for the scheduler tasks
Add some log for the Graphite metrics
Check and clean MONGO_URI parameter
Update doc

2613 of 2893 relevant lines covered (90.32%)

3.61 hits per line

Relevant lines Covered
Build:
Build:
2893 RELEVANT LINES 2613 COVERED LINES
3.61 HITS PER LINE
Source Files on closes-#421
  • List 0
  • Changed 1
  • Source Changed 1
  • Coverage Changed 1
Coverage ∆ File Lines Relevant Covered Missed Hits/Line

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
2236 closes-#421 Closes #421: backend is very long to stop because of the timeseries retention flush Add a logger configuration for the scheduler tasks Add some log for the Graphite metrics Check and clean MONGO_URI parameter Update doc push 24 Apr 2018 11:57AM UTC mohierf travis-ci pending completion  
2228 closes-#421 Check and clean MONGO_URI parameter push 24 Apr 2018 06:28AM UTC mohierf travis-ci pending completion  
2225 closes-#421 Closes #421: backend is very long to stop because of the timeseries retention flush Add a logger configuration for the scheduler tasks Add some log for the Graphite metrics push 23 Apr 2018 05:01PM UTC mohierf travis-ci pending completion  
2220 closes-#421 Closes #421: backend is very long to stop because of the timeseries retention flush Add a logger configuration for the scheduler tasks push 23 Apr 2018 10:37AM UTC mohierf travis-ci pending completion  
See All Builds (853)
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc